Pumpkin Hollow Hoisting Systems

Service & Auxiliary Hoists
PROJECT DETAILS:
LOCATION: Yerington, NV

MARKET: Copper

MINE: Pumpkin Hollow Mine

OWNER: Nevada Copper, Inc.

CONTRACTOR: FKC-Lake Shore

START DATE: April 2018

COMPLETED: June 2020
FKC-Lake Shore recently provided design-build mine hoists with related appurtenances to Nevada Copper Inc.'s Pumpkin Hollow Mine. FKC-Lake Shore is responsible for the design and fabrication of the Service Hoist, Auxiliary Hoist, Controls and related Conveyances. These hoisting systems will be used to transport personnel, equipment, and supplies underground in support of mining operations.
  • Double-Drum Service Hoist with Controls
  • Service Cage with Counterweight
  • (3) 213-ft³ Skips
  • (5) Head Sheaves
  • 685 Tons of Shaft Steel
  • Auxiliary Hoist with Controls



PRODUCTS & SERVICES:
Underground Mine Service Hoisting System
Mine Skips
Underground Cage
Hoisting System Sheaves
Electrical Controls