PROJECT DETAILS:
LOCATION: Los Angeles, CA

MARKET: Transportation

OWNER: TP/O&G JV

CONTRACTOR: FKC-Lake Shore

START DATE: October 2017

END DATE: May 2021
FKC-Lake Shore was awarded the design-build contract for two (2) Vertical Conveyor Systems for LA Metro's Purple Line Extension, Section 2 Project. The systems are transporting tunnel muck from twin TBMs, Ruth and Harriet–each traveling 2.59 miles. Both Vertical Conveyor Systems are installed near the intersection of Constellation Blvd. and Century Park East in Los Angeles, CA. The vertical belts are FLEXOWELL® S-shape systems designed to handle 500 tons-per-hour at 138 ft. of vertical lift.

Click here to learn more about LA Metro's Purple (D Line) Extension Transit Project.



PRODUCTS & SERVICES:
Underground Mine Vertical Conveyor System
Electrical Controls
underground engineering and shop services
CONTACT INFO:
FKC-Lake Shore
1695 Allen Road
Evansville, IN 47710

Phone: +1 (877) 554-8600
information@frontierkemper.com