Vertical Conveyor Systems

Purple Line Extension, Section 3
PROJECT DETAILS:
LOCATION: Los Angeles, CA

MARKET: Transportation

OWNER: Frontier-Kemper/Tutor Perini JV

CONTRACTOR: FKC-Lake Shore

START DATE: April 2020

END DATE: August 2021

FKC-Lake Shore was awarded the design-build contract for two (2) Vertical Conveyor Systems for LA Metro's Purple Line Extension, Section 3 Project. The systems will be transporting tunnel muck from twin TBMs, Iris and Aura–each traveling 2.56 miles. The vertical belts are FLEXOWELL® S-shape systems designed to handle 680 tons-per-hour at 116 ft. of vertical lift.


PRODUCTS & SERVICES:
Underground Mine Vertical Conveyor System
Electrical Controls
underground engineering and shop services