Paradise Whitney Interceptor
No. 668 & 669
PROJECT DETAILS:
LOCATION: Las Vegas, NV
MARKET: Wastewater
OWNER: Clark County Water Reclamation District
CONTRACTOR: Frontier-Kemper Constructors, Inc.
START DATE: November 2014
COMPLETED: October 2015
Frontier-Kemper recently completed Slurry Microtunneling at the Paradise Whitney Interceptor Project in Las Vegas, NV. The project consisted of:
No. 669
- 6,550 LF of 60-in. Flowtite FRP pipe using Slurry Microtunneling
- (8) drives with drive lengths ranging from 520 LF to 1,500 LF
- Shaft depths ranging from 20 ft. to 30 ft. deep
No. 668
- 5,550 LF of 60-in. Flowtite FRP pipe using Slurry Microtunneling
- (7) drives with drive lengths ranging from 200 LF to 1,050 LF
AWARDS:
2016 Project of the Year
New Installation Honorable Mention
Trenchless Technology