Frontier-Kemper Constructors, Inc. and FKC-Lake Shore were contracted to supply Century Mining, LLC with complete, turn-key packages for Longview Mine's new service and slope portals. The contract was later amended to add the construction of a 16-ft. diameter, raise-drilled ventilation shaft equipped with an FKC-Lake Shore used Emergency Escape Hoist. FKCI's Mine Division scope of work includes:
Service Shaft
24-ft. Diameter Shaft—Conventionally Excavated
Shaft Depth: 880 ft.
Sump Depth: 15 ft.
4-Way Concrete Station
Slope Portal
15° Slope with Belt Entry Station
16 ft. wide x 17 ft. high Horseshoe Shape Cross-Section
2,670 ft. of Mine Development
3,640 ft. of Slope Development
Divider Deck & Belt Structure
Ventilation Shaft
16-ft. Diameter Shaft—Raise-Bored
Shaft Depth: 880 ft.